A deck built from the footings up.
A good deck is mostly about the parts that hold people up: footings, the connection to the house, and guards and stairs at the right height and strength. We build those to the Florida Building Code, and the boards are the easy part.
- Price
- Priced from your photos
- Permit
- We pull it
- Home
- Occupied or vacant homes
- Minimum job
- $4,000
- Contractor
- CBC1267185
This is exterior work, so it is fine while you live in the home.
Priced from your photos, in writing.
We don't show an instant range for this one: the honest number depends on things a size alone can't tell us. Send photos and a rough size, and you get a written, itemized price from what the crew who would build it charges right now. Minimum job $4,000; permit fees at their actual cost.
Is this the right job for you?
Usually for
- Homeowners who want an outdoor space off the back door
- Owners replacing a deck that is soft, loose or failed an inspection
- Rental owners who need a safe, permitted deck before a lease or a sale
Typical jobs
- A new deck off a sliding door, a step or two above the yard
- A raised deck with stairs down to the yard
- Replacing a worn deck on the same footprint
- Finishing a deck someone else started, with the permit closed properly
Not sure it fits?
Start anyway and describe it in your own words. If it isn't ours, we say so plainly and name two or more companies we know, with no fee.
Start this projectWorth knowing first.
- Where it can go
Your city or county sets how close a deck can sit to the property line. We check the address before we draw it.
- The house wall
A deck attaches to a wood-frame wall with a ledger. Against block or a manufactured home, it usually stands on its own posts instead.
- HOA rules
If you have an HOA, check its approval process. We give you the drawings and product sheets to submit.
- Over the water
A deck on land is ours. A dock or anything over the water is marine work with its own permits; we tell you who handles it.
What the price covers.
- Footings and framing
- Ledger connection to the house, or a freestanding design
- Stairs and guards
- Decking in pressure-treated wood or composite
- Permit drawings, permit and inspections
- Cleanup and haul-off
The permit, in general.
Permit: Yes, typically
- Zoning
- Setbacks; docks/shoreline add water-management / county review
- Usually needed
- Site plan · Deck framing plan (FBC-R / span tables or engineered) · Guard and stair details · Notice of Commencement (generally over $2,500; a copy is due to the building department before the first inspection over $5,000)
- Inspections
- Footings · Framing / ledger attachment · Final (guards, stairs)
General Florida Building Code practice, not your building department's answer: the building department decides. Your city or the county may publish a different list. Check your address for its published checklist and sources.
From your photos to the final inspection.
Send photos and a rough size
Where it goes, about how big and how high, wood or composite. Guesses are fine.
We price it from your photos
A written, itemized price from what the crew who would build it charges now. If something needs a closer look, we ask for a specific photo.
Agreement and drawings
You sign one agreement with a small deposit. We prepare the permit drawings and apply.
Build and inspect
Footings are inspected before they are covered, then framing, then the final.
Final walk-through
We walk the deck with you and hand over the closed permit and your written warranty.
Questions people ask
Wood or composite?
Both work in Florida. Composite costs more up front and asks less of you later; pressure-treated wood costs less and needs regular care. We price both if you are undecided.
Why no instant price?
Deck costs depend on height, footings and the house connection more than on size alone. Until our rate card can price that honestly, we price each deck from your photos instead of guessing.
Do I need a railing?
Guards are generally required once a walking surface is a certain height above grade. The height and strength rules come from the Florida Building Code, and the inspector checks them.
What helps us price it
None of it is required to start. Anything you can send saves a round of questions.
- Photos of where it will go, and of the house wall it meets
- Rough size and height off the ground
- Wood or composite (or "not sure")
- Your survey, if you have it
What happens after you send it: you get an email confirming we have it, and we reply within 1 business day. We check the permit picture for your address and send your written price once we have your photos. Nothing is ordered or scheduled until you sign.